Client
Skanska-Porr JV
Key Works
Deep Soil Mixed Columns
- 103 No.
- 1.2m diameter
- 12m depth
Date / Duration
August 2019 / 12 wks

Appointed to provide an array of secanted deep soil mixed (DSM) columns as part of the River Humber Gas Pipeline Replacement project to form a strengthened block over the tunnel horizon to form an effective seal against the soft eye using the high pressure treatments.

Project challenges / GDL solutions

Project benefits for the client