Client
Miller Homes
Key Works Delivered on Site
Structural Earthworks
Soil Modification
Vibro Stone Columns
Topsoil Screening
Retaining Walls
Date / Duration
July 2020 / 6 wks
Topsoil Strip Volume
6,813m3
Cut/Fill Volume
10,447m3
Screening Volume
4,000m3

Employed by Miller Homes to complete the enabling works contract on a former Scottish Power Substation site to provide development platforms for the construction of 61 new residential properties.

Project challenges / GDL solutions

  • The close proximity to an existing residential area and local business meant that it was essential disruption to the local community was kept to a minimum.
  • The site was also bordered by a live railway line and a busy main road so these both had to be taken into account during the construction of our works.

Project benefits for the client

  • Removed the need for previously proposed piling and trenchfill by utilising a combination of vibro stone columns and modification to provide development platforms. This in turn provided cost savings and cost certainty for our client.
  • Topsoil screened to deem it suitable for site reuse.
  • Import and export was minimised bringing environmental benefits.